Questions? Call us: (501) 315-2400
No Image
Available
Pre-Bent S Curve MonoRail
Image may not reflect selected features
Pre-Bent S Curve MonoRail (9ZLRK) by Visual Comfort & Co. Architectural Collection 700MOBHSC60S
CLEAR MO HORIZ. S-CURVE S.NKL
Product Specification
Item #
9ZLRK
Dimensions
Height: 0.60"
Width: 0.30"
Additional product details
Category
Track Ltg.
Subcategory
Track Accessories
Finish
Nickel
Style
Contemporary
Option
Title 20
Category
Monorail Hardware
Finish
Satin Nickel
Style
Contemporary | Modern
Option
Dry Rated
Bulb Dimmable
False
Introduction Date
01/01/2000
Ship Carton Height
6.00
Ship Weight
3
Special Features
From the brand formerly known as Tech Lighting
Vendor Ship Method
UPS Fedex
Warranty
1 Year
Weight
1.10
24 Volt
False
Adjustable Head
False
Cable Field Cuttable
True
Cannot Ship To California
False
Cannot Ship To Canada
False
Damp Rated
False
Dark Sky
False
Dry Rated
False
FWC Compliant
False
Integrated LED
False
Item Color 1
Clear
Master Color
White
Motion Sensor Included
False
Photocell Included
False
Replaceable Lamp
False
Reversible
False
Safety Rating
ETL
Shape
Pre-bent S-curve
Sloped Ceiling Compatible
False
Solar Powered
False
SORAA
False
Stocking Type
Made to Order
System
MonoRail
Title 20
False
Title 24
False
Transformer Required
False
Warm Color Dimming
FALSE
WET IP65
False
Wet Rated
False
Manufactured By
Visual Comfort & Co. Architectural Collection
Finish
Additional options that would change other selections
Item Color 1
Additional options that would change other selections
Master Color
Additional options that would change other selections
Call for Price
Qty:
BASE PRICE:
$
393
99
/ / 1
($393.99 / 1)
Add To Cart
Add To Estimate
Add To Wishlist
Save To Compare
Availability:
  • Manufacturer availability unavailable.
To: From: Subject:
Customer Service
Send Us An Email
Submit
Reset

or give us a call today at:
Phone #: (501) 315-2400
201 Edison Avenue Benton, Arkansas 72015
© 2019 GW Lighting and Home. All Rights Reserved. Powered By XOLogic.